Strata SE1
The specification of fabricated soil and waste drainage systems for a new London landmark building has helped Polypipe Buildin Services come out on top of the competition.
The company has supplied over 2,100 fabricated FUZE TM drainage stacks for the new 485-foot Strata SE1 residential development which is the tallest building in South London and which will act as a centrepiece for the redevelopment of the surrounding Elephant and Castle area
This project provided an excellent illustration of Polypipe’s ability to work in partnership with a customer and a contractor, and to supply them with genuinely bespoke fabricated products which met their requirements exactly and also eliminated problems at the design and manufacturing stages.
Combining this type of value engineering with the ability to manufacture the bespoke products off-site in factory controlled conditions allows Polypipe Building Services to deliver many benefits to the contractor in terms of higher levels of product quality, shorter installation schedules and less need for skilled labour on-site.